recent
projects > mississippi college & brookhaven high school
Need: For this project, the school's baseball coaches wanted
a clear-span, covered facility large enough to house three batting cages.
The facility
they desired would
allow
them
to push back the cages to conduct other drills, providing an economic
multi-use facility for the teams.
Solution: Permasteel Building Systems designed, manufactured and
installed these post-frame and wood truss roof systems with partial walls.
Click on an image to enlarge.
|